|
Projects:
§
Toward
sustainable think tank [2006-2008;
Contractor: USAID]
§
Flat tax
policy assessment in Macedonia
[Contractor:
USAID BEA project for the Macedonian Government]
§
National Competitiveness report of the Macedonian economy 2007
[2007; Contractor: Macedonian Government and USAID BEA]
§
A Study on Determinants and Trends in Remittance Flows in Macedonia
[Contractor:
USAID BEA project for the Macedonian Central Bank]
§
Report on some ex-post aspects of decentralizing primary education
in Macedonia
[Contractor: USAID BEA project for the Macedonian Central Bank]
§
Debt vs equity financing in
Macedonia [Contractor: USAID BEA project]
§
Study on the role of the LSG in economic development and
macroeconomic stability: The case of Macedonia
§
Upgrading CEA Macro model with a LSG module
§ Creditworthiness analyses of LSG [Contractor: USAID BEA project]
-
Creditworthiness
analysis of Strumica
-
Creditworthiness analysis of Veles
-
Creditworthiness at LSG level tool and manual
§
A study on remittances in Macedonia [May - December 2007;
Contractor: NBRM and USAID BEA project]
§ Methodology for economic development ranking of Macedonian LGU for
the Law on balanced regional development [March - September 2007;
Contractor: Ministry of LSG]
§ Preparation of methodology for assessing
creditworthiness in Macedonian LGU [April - December 2007;
Contractor: USAID BEA and MDW projects]
§
Measuring
fiscal capacity at 15 Macedonian LGU [Januar - April 2007;
Contractor: USAID MDW Project]
§
Study on bonds; legal
and institutional framework in Macedonia [January - February 2007;
Contractor: MCEC MEDF]
§
Preparing criteria for distribution of capital fund from the
Ministry of transportation and communication [December 2006 - June
2007; Contractor MTC]
§
Preparing economic analyses for electronic media in Macedonia
[August - October 2006; Contractor; Center for development of media
in Macedonia]
§
Preparation of comments to the new
EBRD strategy based on the 2006 strategy [September 2006;
Contractor: EBRD]
§
Competitiveness
report prepared by CEA for the NCEC
[2006;
Contractor: NCEC/Makstil]
§
Ex post
evaluation of macrofinancial assistance in Macedonia from the EC
together with ECORYS from Holland and CASE from Poland [2005 -
2006; Contractor EC]
§
Local
government borrowing [May-December 2006;
Contractor: OSI/LGI Budapest]
- RATIONALE
OF THE PROJECT
- PRESENTATION
ROMANIA
- PRESENTATION
BULGARIA
- PRESENTATION
MACEDONIA
- PRESENTATION
PROJECT LGU BORROWING
§
Monitoring
of transparency in the privatization process of the electric power
company of Macedonia [May
2005 - May 2006; Contractor: Transparency International]
§
Preparation
of comments to the new EBRD strategy based on the 2004 strategy
[May
2006;
Contractor: EBRD]
§
Improving municipal budget management in Macedonia
[November 2005; Client: Open Society Institute-OSI Macedonia]
- Improving
municipal budget management in Macedonia
§
Identification
and measuring of the transaction costs in the Macedonian economy
[December
2004 - May 2006; Contractor: OSI]
§
Credit
expansion in the region [April
- June 2006; Contractor: FREN]
§
Publishing
a Journal of Economics [On-going]
§
Follow
up on the USAID’s Fiscal Reform Project activities
[On-going]
§
Decentralization
– Our Goal [On-going
since June 2004; Contractor: USAID, Bearing Point, OSCE]
§
Developing
an indicators for regional development in accordance with the EU
methodology [2005-2006;
Contractor:
Sector for European Integration of the Macedonian Government and
GTZ]
§
Creditworthiness
of municipalities [November
2005; Contractor: USAID]
§
Measures
for improving the export and fight trade deficit
[2005;
Contractor: The Chamber of Commerce]
§
Data
gathering and processing and methodology set up for competitiveness
study of the Macedonian economy [November 2004- January 2005;
Contractor:
Booz
Allen Hamilton Inc.]
§
Forum/Workshop
on measuring fiscal capacity of the LSG
[November 2004 – March 2005;
Contractor: OSI-Skopje]
-
Measuring fiscal capacity at LGU level in Macedonia
§
Conference
on FDI [November 2004 –January 2005;
Contractor: UNDP and the Ministry of Economy]
§Database
development for Local Self Government in the Republic of Macedonia
[2004;
Contractor:
World Learning]
§
Consultancy
services for assisting in framing responses to the EU questionnaire
in the economic sphere [August – October 2004;
Contractor: Ministry of Economy]
§
Analysis
of the Industrial Production Decline [July 2004;
Contractor: Ministry of Economy
-
Analysis
of the decline in industrial production in 2004 - Final Report
(PDF: 263kb)
§
Design,
development and implementation of regional and municipal profiling
in the Republic of Macedonia [February – May 2004;
Contractor: World Bank]
- Map
of the 123 Municipalities - HDI
- Map of the
123 Municipalities
- Composite index
- Map
of the 34 Municipalities
- HDI
- Map of the
34 Municipalities
- Composite index
- Map
of the 8 Regions
- HDI
- Map of the
8 Regions
- Composite Index
-
Design and development of the regional and municipal profiling in
the R. Macedonia (pdf,
295kb)
§
Cost-benefit
analysis of proposal for reduction of customs duties on certain
inputs [March
2004;
Contractor: Ministry of Economy]
§
Design
of horizontal equalization scheme for municipalities
[August 2004;
Contractor: Ministry of Finance]
§
Expert
opinion on cost-benefit analysis of proposal for excise duty reduction[November
2003; Contractor:
Bearing
Point]
|